Work

1st Avenue Mixed-Use

Downtown Spokane Living: Mixed-use urban residence for young professionals

This seven-story podium project is a newly constructed residential mid-rise bordering an existing building on the same block. 1st Avenue Mixed-Use has a two-level concrete podium with five above-grade wood-framed levels. The building comprises of 51 residential units and about 3,600-sf commercial space on the street level.

DCI provided civil and structural design and support for this project. The structural scope encompassed developing a demolition plan with the contractor and designing the primary framing systems for the new building. The civil scope involved creating a site plan; identifying site drainage and retention needs; detailing grading plans; and developing a utility plan to fulfill service needs. The project included a stormwater detention tank located below the building to meet local stormwater requirements. DCI also coordinated street frontage improvements with a major city street project, which required close collaboration with the City’s design team.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
53,000
Building Icon
Stories:
7
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
Commercial, Multi-Family Residential
Material Shapes Icon
Primary Material:
Concrete, Steel, Wood

Project Highlights

  • Apartment sizes range from 550-sf to 1,050-sf.
  • Pedestrian activity activate the street-level commercial space.
  • Amenities include a fitness center and high-speed internet.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District