Work

Avista Parking Garage

Prime Parking: Avista campus adds employee parking garage

The Avista Parking Garage added 500 parking stalls to the corporate campus. The structural system is constructed out of cast-in-place concrete, post tensioned concrete, concrete shear walls and columns, and a steel framed roof. The design achieved the clean sight lines for drivers to feel safe in the built environment.

DCI Engineers designed the primary structural systems for the five-story parking garage. The engineering team advised on the post-tension cable stressing for the concrete slabs, which was critical for accomplishing the project schedule. They also came up with alternate reinforcing details for ease of constructability. The overall design team maximized the layout of the parking garage and provided more ceiling height between levels.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
171,000
Building Icon
Stories:
5
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Parking
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry

Project Highlights

  • Staff no longer seek off-street parking in the surrounding neighborhood.
  • BIM technology was utilized to coordinate the unique construction phasing and alternate roof conditions.
  • Structure includes a steel framed roof structure.

Latest work

See all
Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District

Project Heat A N night rendering web
project

Project Heat

Derby City Gaming 100 sm
project

Churchill Downs Derby City Gaming & Hotel