Work

Bryant Elementary

Bryant Elementary Update: A new building for a Helena institution

This 62,000-sf, state-of-the-art facility replaces an 80-year-old building. Featuring steel and concrete decking, steel beams and columns and concrete foundations, the new Bryant Elementary allows room for up to 350 students. The skybridge, which spans 90 feet, connects the main U-shaped building with the gymnasium.

A small piece of the old building remains, however – a metal structure that has been repurposed into a multi-use space. This required some relatively complex retrofitting to get the structure up to code.

Location Pin Icon
Location:
Helena, MT
Cube Measurments Icon
Square Feet:
62,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Features a 90-foot-long, steel truss sky bridge for student foot traffic
  • The structure supports a 50KW rooftop solar array

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District