DCI led the efforts to replace an existing bridge and guardrail of the Cooke Canyon Road Bridge, located in central Washington near Ellensburg. Design improvements accounted for increased loads, road approaches and shoulder. DCI worked closely with the County to select structure foundation and specifications, prefabricated structure options, along with general planning, review, retaining wall and structure replacement design.