Work

Eastside Exchange

The DNA is still intact.”

Brad Malsin, president of Beam Development

Central Eastside’s largest, readapted office/retail center

Portland’s Convention Plaza (built in 1925) transformed into an upgraded office/retail mixed-use building, the largest readapted project of its kind in the Central Eastside District. Until new owners opted for a building occupancy change, the former furniture manufacturing warehouse was slated for demolition. DCI Engineers conducted the initial building evaluation and recommended specific rehabilitation for the new Eastside Exchange.

The result is a contemporary building with sustained materials and a history to tell. Eastside Exchange’s heavy timber columns and beams are now exposed and part of the interior finishes. The lateral system consists of new and existing concrete shear walls. Shotcrete shearwalls were applied to the tower. Thicker concrete spread footings were installed into the foundation. A 3” concrete topping was applied to the sheathing of existing floor systems to act as diaphragms.

The 6,200-sf Exchange Ballroom and the 2,200-sf Exchange Rooftop can be leased for events and weddings.

Location Pin Icon
Location:
Portland, Oregon
Cube Measurments Icon
Square Feet:
96,000
Building Icon
Stories:
5
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial, Historic
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry, Wood

Project Highlights

  • Landscaped, stepped plaza flanking both sides of the building.
  • Updated, operable windows.
  • New wood-framed penthouse for additional office/event space.
  • Rooftop area with sweeping downtown views is leased for events.
  • Exposed and refurbished interior wood structures and ceilings.
  • The full seismic upgrade option saved the building from demolition.
  • Upgraded gravity and lateral systems to support new building loads and seismic performance.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District