Nestled in the high hills of San Simeon, newspaper magnate William Randolph Hearst’s former residence stands as a National Historic Landmark overlooking the Pacific Ocean. Built in 1925, the castle needed its first ever full reroof maintenance which entailed reanchoring new and salvaged ceramic tiles; applying a new layer of waterproofing membrane; and installing new steel grating planks. The renovation covered 30 separate tile roofs where representative round cores could not be drilled to test the concrete strength of the existing roof slabs. DCI Engineers based calculations on conservative concrete compressive strength assumptions. DCI also specified test torque, tension loading, and testing frequency criteria for the originally selected wedge anchor for the roof slabs.

During construction, new field information pushed engineers to find an alternative, smaller anchor size and epoxy for a successful installation. After extensive field testing, the team confirmed the alternative epoxied anchor met strength and load requirements. With the performance criteria satisfied, the general contractor proceeded with the rest of the roof construction for a successful project delivery.

Location Pin Icon
Location:
San Simeon, California
Cube Measurments Icon
Square Feet:
14,500
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Seismic/Adaptive Renovation
Material Shapes Icon
Primary Material:
Concrete

Project Highlights

  • To preserve ornate ceilings, no representative round cores were drilled from the thin roof slabs for compressive strength testing. Engineers were able to base calculations on conservative concrete compressive strength assumptions.
  • California State Parks kept the castle’s normal operating hours for the public during renovation.
  • 80% of the original tiles were salvaged and reinstalled for the roof. The careful approach helped California State Parks preserve endangered lichen species growing on the original tiles.
  • A resident community of species-sensitive bats were humanely relocated during renovation.
  • 30 separate ceramic tile roofs were renovated and reanchored. This project covered 14,500-sf of roof area.
  • The National Historic Landmark now has a long lasting ceramic tile roof durable for high wind loads.

Latest work

See all
Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District

Project Heat A N night rendering web
project

Project Heat

Derby City Gaming 100 sm
project

Churchill Downs Derby City Gaming & Hotel