Work

Hyatt Regency - Oregon Convention Center

Meeting the Tourism Demand: The long-envisioned hotel for Portland’s convention center

The City of Roses is ready to take on bigger national conventions and events, and a 600-room Hyatt Regency can now accommodate the influx of visitors. The 440,000-sf building consists of two distinct portions: a 14-story concrete hotel tower and a four-story steel framed ballroom interconnected with a shared base level.

DCI Engineers was the engineer of record for the primary structural systems of the hotel and parking. The hotel portion is constructed out of post-tensioned concrete floors and a shear wall lateral system. The ballroom contains a lateral system of special concentric brace frames and composite post-tensioned slabs.

Location Pin Icon
Location:
Portland, Oregon
Cube Measurments Icon
Square Feet:
440,000
Building Icon
Stories:
13
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Hospitality & Gaming, Sustainable Design
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • The convention center can attract more events per year now that a larger occupancy hotel is located near the venue.
  • DCI conducted a dynamic modal response spectrum analysis for the non-rectangular hotel tower.
  • The LEED-certified hotel faces the public plaza creating foot traffic between the Hyatt Regency and the convention center.

Awards and Certifications

  • LEED Gold
  • 2021 DBIA National Award Excellence, Commercial Buildings
  • DJCOregon TopProjects 2020, First Place - Hospitality, Retail, Residential
  • 2020 NAIOP Northwest Night of Excellence in Commercial Real Estate, Hospitality Development of the Year
Grant Buckingham Seattle Headshot 2021
people

Grant Buckingham

Chalupa 920 itok Sus Q Vsg9
people

Shirley Chalupa

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District