Work

Lewis & Clark High School Expansion

Classic Meets Modern: High school addition and renovation

Lewis & Clark High School’s most recent expansion and renovation project added about 35,000-sf of new school space and renovated about 7,000-sf of existing school space. The new amenities include nine new classrooms, a new commons cafeteria, a “learning stairs” assembly area, new career center space, a two-story connector portal, and two classrooms in the main building converted into science lab space.

DCI’s structural engineering team developed the basement, foundation, main floor framing (steel & concrete), steel roof framing plans, and a steel & concrete framed connector element joining the new space with the existing school building. The lateral force resisting system is an installation of steel braced frames around the perimeter of the structure to provide lateral support of the upper floors and roof.

DCI’s civil engineering prepared the property for expansion. They coordinated the site survey and developed the demolition, finished contour, stormwater, utility, water, and sanitary sewer plans. They reduced the width of the utility easement where the building addition is located. They also designed a hybrid storm system for on-site and off-site storm water disposal.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
35,000
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • New two-story connector portal links the original school building to the new space
  • Renovation added more library space.
  • Replaced a public water & sewer mains on the site that was about 100 years old

Latest work

See all
2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District

Project Heat A N night rendering web
project

Project Heat