Madison Middle School

Our goal is to provide projects that are aesthetic, and functional; with the goal of giving the students and teachers an environment in which they can excel.”

gLAs Archictects

Out With The Old, In With The New: Engineering innovative learning spaces for Madison Middle School

DCI Engineersprovided structural engineering consultation to help develop a system of auger cast concrete piers for the construction of this 87,000-sf, two-story middle school, located in Eugene, Oregon. Due to the location of the structure in close proximity to a river, uneven subsurface conditions created a challenge for the construction of the foundation. DCI designed the auger cast concrete piers as they were the most cost-effective solution, offered quick installation, and avoided any disruption and expense of driven piles or deep over-excavation. DCI worked with a geotechnical consultation to help maintain architectural design while using straightforward construction and economical practices.

Location Pin Icon
Location:
Eugene, Oregon
Cube Measurments Icon
Square Feet:
87,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry, Wood

Project Highlights

  • Auger cast pier foundation
  • Structural Steel floor framing
  • Engineered timber roof structure
  • Two gymnasiums
  • Student enrollment – 475

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District