Work

Mead School District Performing Arts Center & Union Stadium

March to the Game: New sports destination serves two school programs

Mead School District developed a 4,500-seat football/soccer stadium (15,800-sf), “game day” building (retail), restroom building, performing arts dressing room building, and parking lot to become a $24M sportsplex shared by Mt. Spokane High School. DCI Engineers provided both civil and structural engineering services for the project.

The civil team prepared the 23-acre property with utility services, full road redesigns of Freya Street and Hastings Street, and frontage improvements for East 4th Avenue and Sheridan Street.

The structural team designed the primary framing systems for the project’s separate single-story dressing room and “game day” buildings; both comprise of masonry lateral shear walls. They also designed the new wood-framed restroom building, which was integrated with part of an existing school building.

Location Pin Icon
Location:
Mead, Washington
Cube Measurments Icon
Square Feet:
28,600
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
Recreation & Entertainment, Sports
Material Shapes Icon
Primary Material:
Masonry, Wood

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District