Photo: IA Interior Architects
Work

Mezzanine from Space: Hanging a mezzanine floor in an office tower lobby

This confidential office tower’s new lobby has a new hanging mezzanine creating a second-level amenity space in the former two-story open-air lobby. DCI Engineers worked with Interior Architects to devise a two-phase approach to the renovation beginning with the lobby. The client wanted to add more seating areas to the two-story high lobby space and increase the building’s entrance security. For security, new turnstiles were installed at the front doors in the lobby so workers and guests are verified as they enter the building. To expand the lobby without affecting the upper floors of the building, the project team hung a steel mezzanine from the third-floor structure. DCI designed steel stairs that communicate between the levels in the lobby. The amenity floors can be accessed by a communicating stair and a new elevator. A wood wall was also affixed to the structural steel wall supports as an accent piece. On the building’s outdoor deck, a new steel structure was built to cover a barbeque station.

Location Pin Icon
Location:
Seattle, Washington
Building Icon
Stories:
4
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial, Tenant Improvements
Material Shapes Icon
Primary Material:
Steel, Wood

Project Highlights

  • A new elevator shaft was added to communicate between the lobby’s three levels. The building’s level 1 concrete slab was force tested by 5FYFE and reinforced with fiber wrap in the elevator pit.
  • A two-story wood accent screen was attached to the lobby’s wall with reinforced steel.
  • Structural steel was affixed to the lobby’s ceiling to support a mezzanine level and create a third floor in the space.

People

Zhong 920 itok Um F7 S4 I6
people

Bruce Zhong

Robyn Yang Website
people

Robyn Yang

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District