Work

OREGON EPISCOPAL SCHOOL GYM

Distinctive Gyms: Renovation and expansion will showcase school’s athletic talent

Originally built in the 1960s, Oregon Episcopal School is currently renovating the existing junior varsity gym (20,000-sf); adding a new, wood-framed varsity gym (22,000-sf) with a mezzanine level; and separating these two structures by a seismic joint. Updated spaces will include a new gathering space and athletic offices. The varsity gym’s roof framing consists of massive 102-ft long glulam beams supported by glulam columns. The wood frame design includes a mix of heavy timber, wood open web trusses, and conventional light frame construction.

Location Pin Icon
Location:
Portland, Oregon
Cube Measurments Icon
Square Feet:
42,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12, Mass Timber, Sports
Material Shapes Icon
Primary Material:
Masonry, Wood

Project Highlights

  • The straightforward wood frame design helped the project team move ahead of construction schedule for the expansion.
  • CMU basement retaining walls were installed (instead of concrete retaining walls) to reduce the foundation cost.
  • Owners are pursuing Energy Trust of Oregon Path to Net Zero recognition with this project.