On-Shore Capacity: Drug manufacturing facility supports domestic fulfillment demands

Selkirk Pharma built this state-of-the-art fill/finish facility to produce drug products on-shore for commercial-ready and clinical trial medication and vaccines. About 300 scientists, engineers, and technical support personnel conduct research, manage projects, and operate pharmaceutical production equipment for domestic fulfillment demands. The second level of the facility includes both office and mechanical equipment areas. This facility is the first completed building out of three planned for Selkrik Pharma’s campus in Pacific Northwest Technology Park.

DCI Engineers completed the structural engineering for the project, which included designing and detailing the steel superstructure, braced frames and moment frames, precast concrete tilt-up walls, and foundations. Early concrete and steel permit submittal packages were required to maintain a fast-track project schedule and to address supply chain concerns during the pandemic.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
147,600
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Commercial, Life Science & Laboratory
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Steel structural system is built for future adaptability in floor layout changes.
  • The building’s main entry way includes a grand staircase, which doubles as a lobby assembly area, where the steps act as bleachers.
  • An interstitial floor framing system was suspended from the second floor in the manufacturing areas.
Dave Giordano Spokane web

David Giordano

Principal, Spokane

PE, SE, LEED AP

I enjoy all stages of a project; but, when construction has been completed, and all of the hard work and collaboration of the team has been transformed into a tangible product, that is when I find this job the most rewarding. Helping our clients achieve their vision is always a gratifying experience.”

Related work

See all
Gonzaga University PACCAR Center_4 s
project

Gonzaga University PACCAR Center for Applied Science

Fairview Research Center sc 0
project

Fairview Research Center