Modern Design: New facility will provide 50% more space than previous venue

When complete, the state-of-the-art, three-story Shodair Children’s Hospital will provide more space to accommodate gender diversity, special needs, and the 18+ age group. The facility will have 82 individual patient rooms and amenities will include a swimming pool and gym. Hospital services are being conducted in the partial existing building until space in the new facility becomes available. The facility will include a structural system comprised of steel framing, concrete, special concentric braced frames, and masonry walls.

DCI Engineers designed the basement, foundation, primary framing, and lateral framing systems. For the office, patient rooms, and common areas, the structure will be metal deck supported by steel wide flange beams and columns. The main lateral force resisting system will be a combination of braced frames and two-story “X” configurations. The team fulfilled the design criteria of keeping the structure concealed for anti-ligature purposes. The engineers worked closely with the general contractor and steel fabricator to design an economical and constructible steel framing system.

Location Pin Icon
Location:
Helena, Montana
Cube Measurments Icon
Square Feet:
133,280
Building Icon
Stories:
3
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Healthcare
Material Shapes Icon
Primary Material:
Concrete, Steel, Masonry

Project Highlights

  • This project is being approached with a general contractor/construction manager (GC/CM) delivery method.
  • Construction sequencing and building placement on the site was coordinated early on to verify the existing facilities remained operational during construction.
  • New building will offer more space for visitors and be an industry example for modern pediatric behavior care in Montana.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District