Sierra High School

Continuing to Serve the Community: A larger, adaptable teaching environment for Sierra Summit HS

This two-phased project readapted a former community center into a public charter school building in Seattle’s International District. Since the project was an occupancy change, DCI conducted a seismic evaluation of the pre-fabricated steel building and obtained radar imaging of the existing foundation to study the thickness of the slab edges.

Sierra Summit High School accommodates about 120 ninth and tenth grade students. To add more classroom space, the project team constructed a 9,000-sf self-supporting, wood-framed mezzanine within the existing steel building. The two structural systems are separate, so no additional seismic loads are imposed upon the existing building.

Location Pin Icon
Location:
Seattle, Washington
Cube Measurments Icon
Square Feet:
36,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete, Steel, Wood

Project HighLights

  • Added 28,800-sf of space to the school environment.
  • Incorporated 9,000-sf of a self-supporting, wood-framed mezzanine within the existing building to add more classroom space; since the mezzanine is structurally separate from the existing building, no additional seismic loads are placed onto the steel building shell.
  • Includes interconnected spaces within the school where large, glass garage doors may be opened/close to adjust classroom spaces; also includes an outdoor learning area

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District