Work

TownePlace Suites by Marriott

TownePlace Suites – Redding: A known brand of extended-stay

Near Lake Shasta, TownePlace Suites is a Marriott extended-stay hotel brand that is conventionally wood-framed. DCI’s structural engineers designed the floor, shear wall, bearing/non-bearing walls, and roof framing plans, plus the framing details, connections, and hold-down schedule. The civil engineering team coordinated permit documents and developed grading, stormwater drainage, pavement, and utility plans for the 2.23-acre property. The engineers worked closely with the City of Redding to refine the site improvements.

Location Pin Icon
Location:
Redding, California
Cube Measurments Icon
Square Feet:
150,000
Building Icon
Stories:
4
Geometric Shapes Icon
Service:
Structural, Civil
Pie Chart Icon
Industries:
Hospitality & Gaming
Material Shapes Icon
Primary Material:
Concrete, Wood

Project Highlights

  • Designed a means for offsite stormwater runoff from an adjacent vacant lot to bypass the hotel property during rainy conditions.
  • Outdoor swimming pool on site.
  • 101 suites have full kitchens.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District