Van Vorst Building Reuse

Preserving a 20th Century Landmark Building: Engineering a retrofit of the C.B. Van Vorst Company building in Seattle’s South Lake Union neighborhood

The C.B. Van Vorst Company Building in Seattle’s South Lake Union neighborhood has been a longstanding iconic feature since 1909. As a result, the preservation of the historic facility became a priority. DCI Engineers provided structural design solutions that allowed the building to be retrofitted and rebuilt.

Location Pin Icon
Location:
Seattle, Washington
Cube Measurments Icon
Square Feet:
42,000
Building Icon
Stories:
3
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Seismic/Adaptive Renovation
Material Shapes Icon
Primary Material:
Concrete

Project Highlights

  • The building’s interior framing and a portion of the exterior walls were completely demolished with the only remaining elements consisting of the front façade and half of each side façade.
  • Provided details for construction sequencing to temporarily support the existing façade while allowing the construction of the new interior steel framing.
  • Van Vorst and the adjacent buildings all host the Amazon headquarters.

Latest work

See all
Mari Bellevue MUST CREDIT MZA 3
project

Mari Bellevue

Spokane Co Small Arms Range Final 24
project

Spokane County Small Arms Range & Training Facility

HIPLA Marlin Equity 230927 03 MUST Credit Gensler 7 web
project

1301 Manhattan