I’ve got to tell you, the construction of Martin Stadium has been flawless. It really has been. And again, I attribute that and credit a lot of people. What we’re seeing here today is really something very special.”

Bill Moos as quoted in the Spokesman Review

Bringing a World-Class Stadium to the Palouse: Engineering a cutting edge facility for Washington State University

DCI Engineers provided structural engineering for this $65M expansion to the existing football stadium. This project needed to be completed in one off-season, allowing less than 10 months from construction start to the opening football game and features include new club seating and amenity spaces, luxury boxes, and a new press box.

Location Pin Icon
Location:
Pullman, Washington
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
Higher Education, Sports
Material Shapes Icon
Primary Material:
Concrete, Steel

Project Highlights

  • Structural steel was ordered and detailing begun while the architectural design was less than 50% complete. This involved an extraordinary team effort between DCI and the steel fabricator.
  • The new structure was built over an existing plaza and information technology building, and utilized those existing elements for the structural support of the new building.
  • Stadium includes 1,900 premium seats, 21 suites, 44 loge boxes, and 1,300 club seats.

Awards/News

ENR Best Specialty Contracting Project - WSU Martin Stadium Renovation

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District