Work

West Valley High School Expansion and Renovation

An Upgrade from the 1950s: Engineering the renovation of an existing high school

DCI Engineers provided structural design services for the expansion and renovation of the existing West Valley High School. Built in 1957 and added to in 1961 and 1988, the building was a visual chaos created by additions of various vintages. A focal element of design was a new main entrance, which clearly identifies the school’s primary entry.

Location Pin Icon
Location:
Spokane, Washington
Cube Measurments Icon
Square Feet:
210,000
Building Icon
Stories:
2
Geometric Shapes Icon
Service:
Structural
Pie Chart Icon
Industries:
PK-12
Material Shapes Icon
Primary Material:
Concrete

Project Highlights

  • Included 130,000-sf of modernization and 80,000-sf of new construction.
  • Design team focused on preserving the carved granite archway that was part of the original building by prominently positioning it in the two-story glass lobby, while still making it visible from outside.
  • Open gathering spaces were a key component to the design in order to promote internal circulation and educational programs.
  • Consists of a new 1,865-seat gymnasium, a library, cafeteria, and common area.
  • Included a 150-seat addition to the school’s existing theater.

Latest work

See all
Esto 2023 LS73 001
project

Sacajawea Middle School

2023 August Swinerton The Current EDITED 9 web
project

The Current, River North

Bellingham Admin Building web Ben Benschnieder MUST CREDIT 3
project

Bellingham Public School District